The challenge
A service station group with sites from the inner city to regional NSW, using close to 1,000 MWh a year. Every site had its own meter and its own contract: some on good rates, some locked into long contracts, and some paying far too much.
What we did
- Audited all 17 meters line by line, with the rates worked out per kWh including every charge.
- Moved the sites that were overpaying. One regional site went from around 40.1c to 27.2c/kWh, 32% less.
- Left sites alone where they were already on good rates or locked into contracts, and noted every end date so the next renewal starts early.
- Flagged a metering charge problem at one site and low power factor at another.
The result
- An estimated $44,000 a year in savings across the group
- Up to 32% less at the worst-priced site
- Every contract end date tracked, so no site rolls onto a standard rate