Electric car charging at a pedestal charger
Business EV charging · Sydney and Australia-wide

Business EV charging in Sydney, without blowing your power supply

We design charging for staff, fleets, tenants and customers, with load management that shares your available capacity, so you can add chargers without a costly supply upgrade.

  • AC and DC charging
  • Dynamic load management
  • Solar-integrated charging
Free savings check

Tell us a little about your site. The team will reply within 1 business day.

Get my free savings checkBook a 15-min callor call 0433 679 324
In short

We check your power supply first, then design charging that fits, so you can add chargers without a costly upgrade.

See where this fits on a commercial site →

The hard part of business EV charging isn't the charger. It's your electrical supply. Ten chargers can add well over 70 kW of demand. We start with your switchboard and connection, then design charging that fits, often with solar to charge for close to nothing during the day.

Who it's for

Workplaces

Staff charging at offices and business parks.

Fleets

Depot charging for vans, utes and trucks going electric.

Retail and hospitality

Customer charging at centres, venues and car parks.

Strata and residential buildings

Charging in every bay, or shared bays when there isn't enough power for each resident, with access control and billing per user.

Public EV charging

Network-funded public chargers for sites where drivers stop, often at no upfront cost to you.

Load management

Real-time sharing of capacity across chargers, so you avoid a supply upgrade.

Billing and access

RFID or app access, session billing and reporting on OCPP-compliant chargers.

Not sure what your fleet or tenants drive? EVdex, our electric vehicle database, lists charge rates and connectors for every EV sold in Australia.

Common problems

Common EV charging mistakes

  • No capacity checkChargers installed first, supply problems found later.
  • No load managementSeveral cars plug in at once and trip the main breaker or spike demand charges.
  • Closed systemsChargers locked to one app or network, with no OCPP support.
  • No room to growNo conduit or board space for the next five chargers.
Electric car charging at a pedestal charger
Calculator

EV charging site check

Can your site charge your vehicles? Your power supply limits how many chargers you can run. This gives you a first answer in a few seconds.

-

A first answer only. We confirm it with your interval data and a switchboard check before anything is ordered.

Get my free savings check

Comparing electric vans or trucks, range or running costs? Try the fleet calculators on EVdex.

Fleet charging

See load management at work

Pick a fleet size and switch load management on and off. Without it, every vehicle charging at once can push the site over its supply limit. With it, the chargers share the spare power and every vehicle is still ready by morning.

An illustration, not a quote. A site check confirms what your supply can take.

Host a charger

Host a public EV charger at your site

Charging networks are looking for places where drivers stop: shopping centres, cafes and restaurants, hotels, service stations and car parks. Depending on the deal, the network funds and runs the chargers, you may earn rent or a share of the charging revenue, and drivers spend time at your business while they charge.

  • Network-funded options, with no upfront cost to you
  • Drivers stay on site while they charge
  • We check your supply and handle the network partner

Subject to a site check and the network's approval. Terms vary by network.

Register your interest

Tell us about the site. We'll check whether it suits and come back to you.

What would suit your site?
The site
Your connection to the site
Your details

We never share your details without asking.

Compare

AC vs DC charging

AC (7–22 kW)DC fast (50 kW+)
Charge timeA few hoursAround 15 to 30 minutes for significant range
Best forStaff, overnight fleet, apartmentsPublic sites, busy depots
Installed costLowHigh
Supply impactSmall per charger, managed by load managementLarge, often needs a supply upgrade
How it works

Simple, and the numbers come first

  1. Energy analysisWe start with your bills and 30-minute interval data, so the design fits how your site really uses power.
  2. Feasibility and designRoof, switchboard and grid checks, then a design that balances cost, output and payback.
  3. InstallationInstalled by our licensed, accredited electrical partner, using quality, well-supported brands.
  4. Monitoring and supportEvery system is monitored after install, so faults get caught and fixed early.
FAQ

Common questions

Can I add chargers if my power supply is small?

In most cases, yes. Load management shares the available capacity, so charging may slow at busy times, but you don't need to oversize your supply.

Do I need three-phase power?

Not always. Single-phase can run one 7 kW charger. Three-phase is recommended for 22 kW charging or several chargers.

Can I claim a tax deduction?

You may be able to claim depreciation or a write-off. Confirm with your accountant. We can supply the technical documents.

Guides

Read more

Where we work: Australia-wide. We're based in Sydney and cover every Sydney region ourselves, from the CBD, Inner West, St George and Sutherland to Western Sydney, the Hills, the North Shore and the Northern Beaches. Outside Sydney, we work with installation and service partners in every state and most major regional towns, so we can design, install and service sites anywhere in Australia.

See what you could save

Send a bill or a few details. You'll get a clear answer, with no obligation.

CallFree savings check