Not sure where to start? Start with a feasibility study
A feasibility study looks at your options (solar, batteries, EV charging and electrification) and puts costs, savings estimates, payback and grid checks side by side, so you know what's worth doing before you spend. It suits bigger projects, councils, strata buildings and multi-site businesses.
- Built on your interval data
- Options compared side by side
- Fee credited if you go ahead with us
Tell us a little about your site. The team will reply within 1 business day.
Get my free savings checkBook a 15-min callor call 0433 679 324Not sure where to start? We look at all your options and show you what's worth doing before you spend.
Work out your rough savings, size and payback →See where this fits on a commercial site →A feasibility study answers the question a quote can't: what's the best option for this site, and is it worth doing at all? It's the right first step when you're not sure where to start, the project is large, the decision goes to a board or committee, or there are several ways to go. Our feasibility study guide explains what's in one and what you'll need.
What's in a study
Load analysis
Your 15- or 30-minute interval data, broken down by time of day, season and peaks.
Options modelled
Solar, battery, EV charging and electrification, alone and combined.
Costs and payback
Indicative capital costs, savings estimates, payback and cash flow.
Grid and site checks
Connection capacity, export limits, roof and switchboard constraints.
Funding comparison
Buying outright, finance and $0 upfront arrangements.
Clear recommendation
A plain-English summary you can take to the board, committee or bank.
Who we do this for
Fleet and truck charging
What the fleet really needs overnight, what the site can supply, and charging that fits both.
Learn more →Factories and manufacturing
Solar sized to daytime production, batteries for demand and capacity, and the waste fixed first.
Learn more →Schools
Big roofs and daytime use suit solar. Sized around the school year, with a case the board can approve.
Learn more →Who we've done this for
Councils
Feasibility studies for councils electrifying their fleets: depot charging, site capacity and grid connection, costed and staged.
Logistics and fleet operators
Helping logistics providers plan the move to electric vans and trucks: charging, depot power and running costs.
Strata and mixed-use buildings
Solar and battery feasibility for apartment and mixed-use buildings, from common-property loads to owners corporation approvals.
When a feasibility study makes sense
- Big systemsSolar above 100 kW, batteries or several technologies together.
- Board or committee decisionsStrata, councils, schools and companies that need a written case.
- Grid constraintsSites where export or connection limits could change the answer.
- Multiple sitesDeciding where to start across a portfolio.

What goes into a study
We do the electrical design and the load modelling ourselves. These are from a fleet electrification study for a council depot, with the client details removed. Tap any image to see it full size.
Feasibility study vs a free quote
| Free quote | Feasibility study | |
|---|---|---|
| Covers | One system, one option | Several options, compared |
| Data | Bills | Interval data, site and grid checks |
| Output | A price and estimate | A written report and recommendation |
| Best for | Straightforward sites | Large, complex or committee decisions |
Simple, and the numbers come first
- ScopeWe agree the questions the study needs to answer.
- DataYou share bills, interval data and site details. We visit if needed.
- ModellingWe model each option on your real data.
- Report and walkthroughWe walk you through the findings and next steps.
Common questions
Who are feasibility studies for?
Businesses planning large systems, councils, strata buildings and anyone who needs a board-ready case before committing.
How long does it take?
Usually one to three weeks once we have your data, depending on the size of the site.
Read more
14 Nov 2026 · 4 min readEnergy Feasibility Study: What It Is and When Your Business Needs One
Not sure where to start with solar, batteries or EV charging? What an energy feasibility study covers, when you need one, and what to give the engineer.
Read →
12 Nov 2026 · 2 min readStrata Solar in NSW: A Guide for Owners Corporations
How strata solar works in NSW: approvals, common area vs embedded network setups, and how to present the business case to owners.
Read →
12 Nov 2026 · 3 min readMid-scale solar now qualifies for STCs. Should your business wait?
Systems from 100 kW to 1 MW installed from 1 Oct 2026 can now earn STCs. What changed, why buyers are waiting, and what to do first.
Read →See what you could save
Send a bill or a few details. You'll get a clear answer, with no obligation.