Commercial bakery, Sydney

AP Bakery

Moved to a load-matched contract, then added a 96 kWh battery with a 110 kVA Sigenergy inverter. Usable site capacity went from around 128 A to around 290 A with no transformer upgrade, plus full blackout backup.

Free savings check

Tell us a little about your site. The team will reply within 1 business day.

Get my free savings checkBook a 15-min callor call 0433 679 324
128 A → 290 Amore site capacity, no transformer upgrade
$35k a year saved

The challenge

AP Bakery's ovens and plant start around 3am and wind down by mid-afternoon. They were on a fixed contract that priced in evening-peak risk they never used, and the site only had around 128 A from the grid, well short of what the business needed to grow.

What we did

  • Moved them to a spot-linked contract that matched their daytime load, so they get low daytime market prices without evening-peak exposure.
  • Installed a 96 kWh battery (expandable to 288 kWh) with a 110 kVA Sigenergy inverter to supplement grid supply.
  • Set up full backup, so production keeps running in a grid outage.

The result

  • Around $35,000 a year in estimated savings
  • Site capacity lifted from around 128 A to 290 A, with no transformer upgrade
  • Room to grow the battery to 288 kWh as demand increases

Savings figures are estimates based on this site's bills and usage. Results on another site will differ.

Want results like these?

Send a bill or a few details. You'll get a clear answer, with no obligation.