The challenge
A packaging factory in Padstow using around 420 MWh of power a year, mostly during daytime production, with a big compressed-air load. They wanted lower power costs and to know where their energy was going.
What we did
- Designed a 270 kW rooftop system around the site's production load.
- Managed the install with our licensed partner and set up monitoring.
- Ran an energy audit: installed meters across the site to see exactly what was using what.
- Followed up with a compressed-air audit and replaced an inefficient air compressor.
The result
- About 500 MWh of solar made from May 2025 to October 2026
- An estimated $78,000 saved in that time, around $52,000 a year
- About 20% less energy used after the audit and compressor upgrade