A static VAR generator (SVG) is an electronic unit, a bit like a solar inverter, that supplies the reactive current your motors and air-con need right at the switchboard, so the grid doesn't have to. It lowers your kVA and the current on your main switch. It doesn't lower your kWh.

The problem it solves

Motors, compressors, air-con and lifts draw two kinds of current. One part does the work. The other part, reactive current, just builds the magnetic fields those machines need, and flows back and forth without doing anything useful. Your cables, main switch and the network still have to carry it.

Think of a truck that has to carry a pallet of empty crates along with the goods. kW is the goods, the empty crates are the reactive power (kVAr), and kVA is the whole load on the truck. Power factor is goods divided by total load. At 0.90, your supply carries about 10% more current than the work needs.

That matters in two ways. If your network bills demand in kVA, you pay for the whole truckload. And if your main switch or transformer is near its limit, the empty crates use up headroom you might need on a busy day. Our power factor guide covers which tariffs bill kVA.

How an SVG works

  1. It measures - current transformers (CTs) on your mains read the site's current thousands of times a second.
  2. It finds the reactive part - its controller splits out the part of the current that isn't doing work.
  3. It makes the opposite - fast-switching transistors build an equal and opposite reactive current. The newest units use silicon carbide transistors, which switch faster and run cooler.
  4. The two cancel out - they meet at your switchboard, so the grid only supplies the useful current. As the load changes, the SVG follows it within milliseconds.

Older power factor correction does the same job with banks of capacitors switched in and out in fixed steps. An SVG makes the exact amount needed, continuously.

SVG or capacitor bank?

Capacitor bankSVG
How it correctsFixed steps switched in and outContinuous, no steps
SpeedSeconds with contactors, faster with thyristorsMilliseconds
AccuracySteps mean it over- or under-correctsHolds about 0.99
HarmonicsCan resonate, so often needs detuning reactorsNot prone to resonance
Low voltageOutput falls when voltage fallsOutput holds
Phase balanceNoCan even out the three phases
UpkeepCapacitors wear out and need replacingMainly fans and filters
Up-front costLowerHigher

A capacitor bank still suits a steady load, like a factory running the same motors all shift. An SVG earns its place where the load jumps around: kitchens, cool rooms, lifts, compressors and air-con cycling on a hot afternoon.

Will it lower my energy use?

No, and anyone who says it will cut your kWh by a big percentage is overselling. Your meter's kWh count only real power. Reactive power isn't billed as kWh. The SVG itself turns roughly 1% of its output into heat, so it adds a little use, partly offset by lower losses in your cables.

The value is in three other places:

  1. A lower kVA demand charge - if your tariff bills kVA, the billed peak falls.
  2. Headroom - less current through your main switch, cables and transformer. That can help a site that trips on its busiest days, or make room for EV chargers or more air-con without a supply upgrade.
  3. Balanced phases - evening out the three phases lowers the current on the busiest one, which is the one that trips.

What it can be worth

Take a site on Endeavour Energy's N19 tariff with a 250 kVA peak between 4pm and 8pm and a power factor of 0.90. Correcting to 0.99 drops the billed peak to 227 kVA, and cuts the current at that moment by about 9%.

Endeavour N19 example22.7 kVA x (53.11c x 151 days + 48.33c x 214 days)$4,173 a year

Gross network saving for an illustrative site, before the unit, installation and its running cost. Your result depends on your power factor during the peak window, and on your tariff.

On a site that trips, the headroom is often worth more than the bill saving, because the alternative can be a new main switch, bigger cables or a network upgrade.

How big an SVG?

Size depends on how much load you have and how poor the power factor is. As a rough guide, to reach 0.99:

Power factor todaykVAr per 100 kW of load
0.8061 kVAr
0.8548 kVAr
0.9034 kVAr
0.9519 kVAr

So a site peaking at 300 kW with a power factor of 0.85 needs about 143 kVAr. Units come as modules (commonly 30, 50, 100 and 200 kVAr) that run side by side, so you can start at the measured size and add later.

Don't size from a bill alone. Log power factor, current and harmonics at the main switchboard for a week or two, including your busiest days. See our on-site energy audits.

What to watch for

  1. Harmonics are a separate job - an SVG corrects power factor and phase balance. A high neutral current from harmonics needs an active harmonic filter. Some models do both.
  2. Where the CTs go - they must see the whole site current. If each phase runs in parallel cables, the CTs go on the busbar or around every cable.
  3. Solar changes the picture - solar cuts the kW you buy but not the kVAr, so your power factor can look worse in the middle of the day. Put the CTs on the grid side so the SVG corrects what the meter sees.
  4. Heat and space - wall-mount modules are compact, but the room needs ventilation for the heat they give off.
  5. Check your tariff - on a kW tariff there's no demand saving. Then it's only worth it for headroom.

When it's worth a look

  1. Your tariff bills kVA - and your power factor is under about 0.90.
  2. Your main switch trips on busy days - or you're near your supply limit and want to add load.
  3. Your load changes fast - and a capacitor bank keeps hunting or failing.

If your power factor is already 0.95 or better and you're billed in kW, spend the money elsewhere.

Next step

Find out if it's worth doing on your site

Send us what you have. We'll tell you whether it's worth doing, marginal or not worth it.

  1. Your latest billPower and gas if you have both. A photo is fine.
  2. 12 months of half-hourly dataWith your sign-off, we can request it for you.
  3. Anything that's changingExisting solar, new equipment, EV chargers or extra shifts.
FAQ

Common questions

What is a static VAR generator?

An electronic power factor correction unit. It measures your site's current and injects an equal and opposite reactive current, so the grid supplies only the useful part.

Does an SVG reduce my kWh?

No. It lowers kVA and current. The savings come from kVA demand charges and freed-up capacity, not from energy use.

Is an SVG better than a capacitor bank?

For fast-changing loads, sites with harmonics or tight switchrooms, usually yes. For a steady motor load, a capacitor bank can do the job for less.

Can an SVG work with my existing capacitor bank?

Often, yes. The SVG fills the gaps between the capacitor steps, which can be cheaper than replacing a bank that still works.

See what you could save

Send a bill or a few details. You'll get a clear answer, with no obligation.

CallFree savings check