Calculators

Depot charging planner

Planning to charge a fleet at your depot? Add your vehicles and see whether your power supply copes, then test a supply upgrade, a new substation, solar or a battery.

  • Works for cars, vans, trucks, buses and plant
  • Shows the supply, solar or battery you'd need
  • Free, no sign-up

1. Your vehicles

Add a line for each kind of vehicle that charges at the depot. Rough numbers are fine.

2. Your site today

From your power bill and switchboard.

3. What to test

Try a bigger supply, solar and a battery, or both.

Grid supply
Weather
Charging control

A day at the depot, noon to noon

What it would take

    Get a feasibility study for your depot

    A first answer only, using typical figures and Sydney sunshine. A feasibility study replaces them with your interval data, switchboard, roof and routes. Or ask a quick question.

    How it works

    Three ways to power a growing fleet

    Most depots end up choosing between these, or mixing them. The planner lets you test each one against the same fleet.

    Manage the load

    Spread charging across the night so the depot stays under its supply. Usually the cheapest first step, and often enough for vans and cars.

    Upgrade the supply

    A bigger connection, or a new substation for large truck fleets. The most robust answer, but network approvals and lead times can run to a year.

    Add solar and a battery

    Solar on the roof by day, a battery to carry it into the night. Cuts power bills too, but needs a plan for cloudy weeks.

    Common questions

    How accurate is this?

    It's a first answer. It uses typical energy use for each vehicle type, a typical shape for your site's own load and Sydney sunshine. A feasibility study swaps those for your interval data, switchboard, roof and real routes, and that's what you'd take to a board or a grant application.

    What does load managed mean?

    A load controller shares the available power between chargers so the depot never goes over its supply. Each vehicle still gets its full charge, spread over the hours it's parked. Without it, every charger starts at full power when vehicles return, which is when sites hit their limit.

    Why a 4-hour battery?

    Depot batteries are usually sized to cover the evening and overnight hours when solar is gone. A 4-hour battery (for example 250 kW and 1,000 kWh) is a common commercial size, so the planner keeps that ratio to stop the power and energy drifting apart.

    How do I find my main switch size?

    It's printed on the main switch in your switchboard, in amps. If you're not sure, a photo of the switchboard and a recent bill is enough for us to check.

    When does a new substation make sense?

    When the depot needs several hundred kW more than it has. Smaller gaps can often be closed with load management, a supply upgrade, or solar and a battery. A new substation is the most robust option but brings network approvals and long lead times, so it's worth testing the alternatives first.

    Can I use this for trucks?

    Yes. Add a line for each truck type with its daily distance and charger. For specific makes and models, the depot calculator on EVdex uses each vehicle's own battery and charging figures.

    More about EV charging for business

    CallFree savings check